GENERAL SERVICES ADMINISTRATION WAREHOUSE RENOVATION, BAYS 2 & 3

AUBURN, WASHINGTON

ORB Architects provided design-build criteria and prepared the design and documentation for this project, which consisted of the renovation of the existing General Administration Services warehouse facility to the General Motor Dynamics vehicle parts maintenance warehouse and offices.

ORB also provided construction supervision, review and approval of contractor’s submittals,
shop drawings and as-built drawings at the completion of the project.
More Info →



 
.
.
.
 
© 2006 ORB Architects. All rights reserved.

607 SW Grady Way, Suite 210   |   Renton, WA 98057   |   425.226.3522 phone   |   425.226.9115 fax   |