TRI-CITIES REGIONAL AQUATIC CENTER
TRI-CITIES, WASHINGTON
FEASIBILITY AND CONCEPTUAL DESIGN
ORB Architects was retained by the Tri-Cities Aquatic Task Force to assist in the preparation of a feasibility and conceptual design study for a new indoor Tri-Cities Aquatic Center. ORB and Vic Davies Architects (VDA) prepared the conceptual design for this project.
This concept consisted of a 67,910-square-foot wet-side aquatic facility and a 20,050-square-foot dry-side area, for a total facility area of 88,010 square feet. The basic facility was estimated to cost $24,534,55 (including sales tax, contingency, furnishings and equipment, design, testing, and construction administration). The addition of specialized water play equipment such as a Master Blaster, Flow Rider (surf machine) and corkscrew slides could bring the total facility cost to $28,534,551. These estimates did not include the cost of land.
More Info →